Tuesday 12 April 2011

Discussion regarding DCS and PLC in our case

1.DCS- master
2 PLC- slave
       these combination we are going to use to run the plant.
- bottle filling application is on PLC which we are doing
- the major parr as tank level,temparature,mixture content,agitator,mass are controlled through DCS
-so suggest your control strategies.
-regarding basic information or quries post here

3 comments:

  1. I think so that we have to first make our process flow diagram then
    we should have to list out the number of variables to be controlled and then shortlist them in two groups.
    1) Critical
    2) not critical
    So we can decide our control loops to be controlled by PLC/DCS.

    ReplyDelete
  2. hi ravindra,
    1.we have process flow digram,and we developed process and instrumentation diagram.if u have other control strategies then let us know.
    2. regarding batc reactor bottle filing and conveyor motion start -stop will be controlled on B & R plc.
    batch reactor instruments will be controlled through Delta V DCS,

    -Shri

    ReplyDelete
  3. The PNID can make us decide the strategy.........
    so guys whoever have it ... share it... then we can move forward

    ReplyDelete